??? ImgAlt ???

Secondary legislation

Codes elaborated based on the Energy Law together with other ANRE regulations and licenses

Wholesale market

  • Order 14/2006 – The procedure related to the takeover of the electricity delivered in the electrical networks by the electricity generation capacities
  • Order 25/2004 – Electricity Wholesale Market Commercial Code
  • Operational procedure – Allocation of the interconnection capacity of the National Power System (NPS) with the neighbouring power systems
  • Order 21/2003 – Emergency procedure for the breakdown of the internal electricity market in case the forecasted load curve and/ or the reserves demanded by the System Operator cannot be covered by the producers’ offers
  • Dec. 443/2002 – Procedure for the regulation of specific actions on the electricity wholesale market required for the transition from the summer period to the winter period and vice versa
  • Order 29/2001 – Procedure for the allocation of the electricity volumes from the portfolio contracts in case of the producer’s spin off or in case he transfers part of its own capacities to another company
  • Order 25/2002 – Procedure for the monitoring of the external electricity trading activities
  • Dec. 83/2000 – Electricity supply frame contracts for eligible customers

Retail market

  • Order 28/22.06.2011 – Appointing the electricity supplier of last resort for the period July 1st 2011 – June 30th, 2012.
    Download
  • Order 15/2007 – Appointing the electricity supplier of last resort for the period July 1st, 2007 – June 30th, 2008
  • Order 14/2007 – Guideline related to the electricity supplier of last resort
  • Order 12/2007 – Amendment of the ANRE President’s Order no 26/2006 related to the statutory declarations of the household customers who benefit from a social tariff
  • Order 41/2006 amended by Order no 15/2001 that approves the Procedure for the reposting of data related to electricity customers compliant with Directive CE 377/90
  • Order 34/2006 – Procedure related to the way customers with regulated tariffs, with a maximum contracted power higher or equal to 3 MW provide the suppliers with the data required for the elaboration of the electricity forecast
  • Order 38 /2005 – Procedure for the terms and the way of granting the social tariff to household customers of electricity, as amended under Order no 6/2006 and Order no 26/2006 (amended by Order no 12/2007)
  • Order 15/2001 – Procedure for the reposting of data related to electricity customers compliant with Directive CE 377/90
  • Order 41/200 – Guideline for labelling the electricity supplied to customers

Technical rules

  • Order 1/2010 – Performance standard of the electricity supply service, published in M.O nr. 51/26.01.2010
    Download performance standard
  • Order 49/2007 Technical rules related to the limitation of the protection and safety area corresponding to energy capacities
  • Order 46/2007 – Guideline for the authorisation of the electricity metering operators in the national power system
  • Order 38/2007 – Procedure for the settlement of disputes arising from the conclusion of the contracts between economic operators in the energy sector, of the electricity supply contracts and of the network connection contracts
  • Order 17/2007 – Performance standard for the electricity transmission system services
  • Order 28/2007 related to the approval of the Performance standard for the electricity distribution service
  • Order 24/2006 – Procedure for the electricity correction in case the metering points differs from the settlement point – Rev.1
  • Order 09/2006 – Connection to the electricity distribution networks frame contract for the users whose connection fee is totally or partially established based on the estimate
  • Order 09/2006 – Connection to the electricity distribution networks frame contract for the users whose connection fee is set up according to some standard schemes, based on specific tariffs and indexes
  • Order 37/2005 – for the approval of Technical connection permits – frame content
  • Order 35/2005 – that approves the Procedure related to the assurance of reactive electricity volume and its payment method
  • Order 18/2005 – Procedure for the calculation of the electricity billed when the metering group is damaged
  • Dec. 245/2003 – Procedure related to the co-operation of the transmission and distribution system operators for the endorsement of the users’ connection to the electrical networks
  • Order 29/2003 – Methodology for the set up of the fees for the connection of the users to the medium and low voltage distribution networks
  • Order 28/2003 – Methodology for the set up of the cash indemnities paid to users connected to the distribution electrical network in different periods via a common installation
  • Order 35/2002 – Guideline for the management and organisation of the maintenance activity (replacing PE 016/96)
  • Dec. 301/2000 – Methodology for the identification of the no consumption and peak intervals in the NPS
  • Order 4506 – Guideline related to the set up of solutions connection for the connection of the users to the electrical networks of public interest

Technical regulations

  • Order 38/2008 – Regulation for the designing and execution of electrical cable networks – NTE 007/08/00
  • Dec. 1424/2006 – Regulation for the methods and elements used to calculate the safe operation of the electrical installations – NTE 005/06/00 (revokes PE 0131994)
  • Order 7/2006 – Regulation concerning the methodology for the calculation of the short circuit currents in the electrical networks with a voltage value below 1 kV–NTE 006/06/00
  • Order 08/2005 – Regulation for the analysis and identification of accidental events in the installations of generation, transmission and distribution of electrical and thermal energy – NTE 004/05/00
  • Order 32/2004 – Regulation for the construction of the overhead electrical lines with a voltage valued above 1000 V–NTE003/04/00 (revokes PE 104/1993, PE 122/82 and PE 123/78)
  • Dec. 269/2003 – Methodology for the determination of the economical section of the wires in the distribution installations of 1–110 KV – NTE 401/03/00 (revokes PE 135/91)
  • Order 34/2003 – Regulation for testing and measuring of the protection, remote control and automation systems for the electrical elements of the power plants and substations – NTE002/03/00 (revokes PE 116–2/1992)
  • Order 02/2003 – Regulation for choosing the insulation, coordinating the insulation and the protection of the electrical installations against overloading –NTE 001/03/00 (revokes PE 109/92)

Technical codes

  • Order 20/2004 – The Technical Code of the Electrical Transmission Networks – Revision I, as amended and completed – Order 35 /2004
  • Order 17/2002 – The electricity metering code
  • Dec. 101/2000 – The Technical Code of the Distribution Electrical Networks

Supply contracts

  • Order 05/2003 – related to the amendment of the electricity supply frame contracts
    Download
  • Dec. 057/1999 – Electricity supply frame contract for large industrial and similar end customers at regulated tariffs, as amended under Order 37 /2005 (concerning the approval of the Technical Connection Permits)
  • Dec. 057/1999 – Electricity supply frame contract for small industrial and similar end customers at regulated tariffs, as amended under Order 37 /2005 (concerning the approval of the Technical Connection Permits)
  • Dec. 057/1999 – Electricity supply frame contract for household customers
    Download

Distribution contracts

  • Order 05/93/2007– an ANRE/ ANRSPGC common order – Frame contract for the use of the electricity distribution network in view of providing the public lighting service.
  • Order 23/2005 – Electricity purchase frame contract to cover the losses in the distribution electrical networks concluded between an [ENERGY PRODUCER] and the [DISTRIBUTION OPERATOR]
  • Order 43/2004 – Electricity distribution frame contract, as amended under Order 37/2005 (concerning the approval of the Technical Connection Permits) and as completed under Order 12/2005

Wholesale market contracts

  • Order 11/2007 – related to the Amendment of the Electricity purchase frame contract concluded between an [Electricity producer] and the [supplier of captive customers]
  • Dec. 1774/2006 – Electricity purchase frame contract concluded between electricity producers
  • Order 42/2005 – Electricity purchase frame contract concluded on the centralised market of bilateral electricity contracts (PCCB)
  • Order 29/2005 – Frame contract for purchasing electricity produced in qualified configurations for uncontrollable prioritised generation.
  • Order 22/2005 – Electricity purchase frame contract concluded between an [Electricity producer] and the [supplier of captive customers] (revoking Order no 36/2004, Order no 32/2002, Dec. 28/1999)
  • Order 06/2005 – Frame contract with the electricity purchasing option concluded between a [Thermal energy Producer] and SN Nuclearelectrica SA
  • Order 03/2005 – Frame contract with the electricity purchasing option concluded between a [Thermal energy Producer] and SC Hidroelectrica SA

Authorisation of economic operators

  • Order 24/2007 – Guideline for the authorisation of the economic operators designing, executing, checking and operating electrical installations in the power system (Revision 3)
  • Dec. 1563/2005 – Guideline for the organisation and operation of the commission that authorises economic operators designing, executing, checking and operating electrical installations in the power system (Revision 1).
  • Internal procedure for the calculation of the indicators used for economic and financial analysis of the economic operators activity in view of authorising them to design, execute, check and operate installations.

Electricians’ authorisation

  • Order 25/2007 – Guideline for the authorisation of electricians designing, executing, checking and operating electrical installations in the national power system (Revision 3).

Other regulations

  • Order 56/2007 – Guideline for finding, notifying and sanctioning the deviations from the regulations issued in the energy and sectors.