??? ImgAlt ???

Service providing

Information about the ANRE authorised operators

As per the observance of the legislation and regulations in force, all economic operators carrying out designing activities and executing electrical installations connected to the National Power System have to hold an authorisation issued by the Romanian Energy Regulatory Authority (ANRE)*.

They are obliged to (sub)contract works corresponding to the authorised activities only with economic operators authorised by the competent authority for the respective works:

See the complete list with authorised economic operators.

The list with the authorised economic operators comprises information related to the following: name of the company, contact data, type of authorisation* and the validity term of the authorisation.

Types of authorisations and the activities the economic operator can provide/contract:
Type of authorisation Authorised activities
A Loading equipments and electrical installations
B Designing and execution of electrical installations inside civil and industrial construction, overhead and underground connections under a nominal voltage value of 0.4 kV
C1A Designing overhead electrical lines or underground cables with a nominal voltage value of 0.4 kV ÷ 20 kV and posts of transformer with a superior nominal voltage value of 20 kV at most
C1B Designing overhead electrical lines or underground cables with a nominal voltage value of 0.4 kV ÷ 110 kV and posts of transformer with a superior nominal voltage value of 20 kV at most
C2A Executing overhead electrical lines or underground cables with a nominal voltage value of 0.4 kV ÷ 20 kV and posts of transformer with a superior nominal voltage value of 20 kV at most
C2B Executing overhead electrical lines or underground cables with a nominal voltage value of 0.4 kV ÷ 110 kV and posts of transformer with a superior nominal voltage value of 20 kV at most
D1 Designing overhead lines with nominal voltage values of 110 kV ÷ 400 kV, underground cables with nominal voltage values of 110 kV or 220 kV
D2 Executing overhead lines with nominal voltage values of 110 kV ÷ 400 kV, underground cables with nominal voltage values of 110 kV or 220 kV
E1 Designing electrical substations and installations belonging to the power plants
E2 Executing electrical substations and electrical works in the plants
F Executing works for the painting of the electrical network sustaining elements/wood-cutting for the route of the overhead electrical lines